Know your all-in site costs before you commit to a parcel. Adjust your conditions and get a ballpark range in seconds.
Estimated site prep range
$10,000 – $25,000
Flat lot with utilities at the line. Best-case scenario.
Flag: Your parcel conditions suggest site prep could approach or exceed the cost of the prefab unit itself. Run a full due diligence checklist before signing anything.
Cost breakdown
Foundation$7,000 – $15,000
Grading & clearing$3,000 – $5,000
Utility runIncluded at line
Sewer / septicMunicipal hookup — $1,000 – $4,000
Crane set$3,000 – $6,000
Delivery$5,000 – $10,000
Permits$500 – $5,000
Prefab structure (for reference)$80,000 – $130,000
1
Where are the nearest utility stubs?
Call the utility provider with the parcel number before you make any offer.
2
Has a perc test been done?
Failed soil means engineered septic. That alone can add $25,000+ to your project.
3
Can a crane and a semi get clean access?
Tight clearances can kill a standard modular drop or add significant cost to work around.
Estimates are ballpark ranges based on national averages for STR parcels. Actual costs vary by region, contractor, and site-specific conditions. Always get at least 3 quotes before committing to a project.